Excavator SandboxA hands-on 3D excavator sandbox. Discover tracks, hydraulic cylinders and the art of moving sand.Preparing your sandpit…Enable JavaScript to operate the excavator.playgroundSite navigationAll projectsSmall moves. Big discoveries.Take the controls. Scoop some sand. Find out how the machine moves.Slow modeSoundSound offNew sandpitInteractive 3D excavator, sand mound and target box. Use the labeled controls to move the machine.Training siteScoop → lift → turn → emptySystems readyCamera viewOrbitSideTopBucketDrag to look around · scroll to zoomExternal viewCab viewSwitch the main camera to the cabSwitch the main camera to the external viewMachine instrumentsHyd pressureEngine rpmBoomStickBucketSwingLoad volumeSand totalbalanceTracks liftingPushing against groundSand resistsTracks working through sandLoad above struck capacityAdhered load remainsLoad oscillationcmThe sand pushes back. Watch it spread as the bucket moves slowly through it.The bucket is supporting the machine. Raise the boom to lower the tracks gently.Lift the tracksFrom a new sandpit, hold Boom → Lower at full input for 8–10 seconds. The sand spreads first. Once the bucket reaches firm ground, sustained pressure slowly lifts the front of the tracks. Raise the boom to come back down. Try the Side view!Training exercisesChoose an activityMove the sandLearn to steerTurn the platformLower the teeth into the sand, then curl the bucket and pull the stick in. Lift, turn toward the green box, and open the bucket. Small movements make it easier.W and S drive both tracks. A and D counter-rotate them. In a chord, A always selects the left track: W+A goes forward and S+A goes backward. D does the same for the right track. Try the cone ahead of the left track: rubber bends, topples and slips aside instead of stopping the machine. Sand slows the tracks and forms ruts, while downhill travel needs little effort.Turn the upper platform and watch the tracks. They stay put! The boom, cab and bucket turn together. Try the top view to see the difference.Digging guide & keyboardStart with the bucket open. Lower the boom until the teeth enter the sand.Curl the bucket while pulling the stick inward. The pile changes as sand enters the bucket.Raise the boom. Keep the bucket curled so sand stays inside.Turn the platform until the bucket is above the green box. Try the top view.Open the bucket to pour. If a little sand sticks, keep it raised and give a few short Curl → Open shakes. The last clumps loosen! Sand that misses the box stays on the ground.Turn the tracksExcavator controlsKeyboard deckHold a keycap with the mouse or touch it. The same letters work on a keyboard; release them to stop.A selects left: W+A forward, S+A back · D selects right: W+D forward, S+D back · R+G moves the teeth level inward, T+F level outwardControl requestReleasedfull flowopposite requests cancelBoomStickBucketPlatformLeft trackRight trackBoth tracksSandTarget boxThe two cylinders lift or lower the long boom. Watch their shiny rods move.T extends the stick away from the machine; G flexes it and pulls the bucket inward.Curl to scoop; open to pour. With the bucket raised, quick curl–open shakes loosen sticking sand.A hydraulic motor turns the upper platform. The tracks stay in place.Move just the left track to turn. Its direction follows the undercarriage, not the cab.Move just the right track to turn. Its direction follows the undercarriage, not the cab.Both tracks move together. Use A / D or the separate track controls to steer.LowerRaiseReach outPull inOpenCurlLeftRightReverseForwardMovement requestHold a button or move the slider. Release to stop.Joint anglePlatform turnFrom starting pointmMovement limit reached. Try the opposite direction or lift the boom.Combine several movementsSettings & starting positionShow part labelsLighter graphicsStarting bucket angleEmpty the bucket and let falling sand land first. The angle stays within the machine’s movement limits.Reverse bucketDefault: opening toward the excavator. Reverse it at any time; carried sand bursts outward first and the arm raises if needed.The teeth now point in the opposite direction. Explore how Boom, Stick, Curl and Open change what this mounting can push or collect.The bucket mounting direction has changed.The bucket was remounted. Its carried sand burst outward and will settle around the site.Return machine to its starting poseSlightly sticky sand: it holds together, slips and responds to shaking. All sand is conserved in this simplified teaching model.Sand resistance, track ruts, slipping heaps, machine sound and ground reaction are simplified for learning. A held key requests full flow, not a measured force.Machine audio samplesThe 3D scene could not start. Try a browser with WebGL enabled, or turn on hardware acceleration and reload.Try againThe sandpit has been reset.The machine has returned to its starting pose; carried sand has been returned to the ground.Bucket load registered. Curl the bucket and raise the boom.Load raised. Slew toward the green box, then open the bucket.Transfer registered. Take another pass or recover sand from the box.You drove and turned. Different track speeds change the direction.The platform turns independently of the tracks.